CNX Shirley VRU Pad
PROJECT HIGHLIGHTS
Utilizing Helical Piles embedded into a 9” concrete slab. TEK was able to eliminate the proposed concrete “sleeper” footings and foundations, greatly reducing cost and installation time.
PROJECT DATA
Project | Shirley VRU Pad |
Location | Alma, WV |
Client | CNX |
Engineering | Piles - TEK/CSD |
Project | Piles - 4 days |
Duration | 4 Days |
Services Provides | Helical Pile & Concrete design, supply, install. |
![CNX NV 57 Dehy Station](https://sp-ao.shortpixel.ai/client/to_webp,q_glossy,ret_img/https://www.tekpiles.com/wp-content/uploads/2016/02/CNX-Shirley-VRU-Pad-1.png)
![](https://sp-ao.shortpixel.ai/client/to_webp,q_glossy,ret_img/https://www.tekpiles.com/wp-content/uploads/2016/02/CNX-Shirley-VRU-Pad-2.png)
![CNX NV 57 Dehy Station](https://sp-ao.shortpixel.ai/client/to_webp,q_glossy,ret_img/https://www.tekpiles.com/wp-content/uploads/2016/02/CNX-Shirley-VRU-Pad-3.png)